Cases South East Asia

2019-03-22

Case Study (Kindsland Tier 3-Plus Data Centre)(Singapore)

Developer: Kingsland Development

M&EConsultant: i3 Critical Facilities Pte Ltd

Project GFA: 20,000m2

Project Type:  Data Centre

Application:  Chilled Water System

ProductInstalled:    AVK / ICV Series 76 Concentric Butterfly Valve, from 65mm to 400mm - 600nos

AVK/ ICV Series 756 Double eccentric butterfly valve, 600mm - 32nos, 700mm - 30nos, 800mm- 58nos

   

Case Study (Singtel Tier 3-Plus Data Centre)(Singapore)

Developer:  Singapore Telecommunications Limited (Singtel)

M&EConsultant:  DSCO Group

Project GFA: 53,000m2

Project Type: DataCentre

Application: Chilled Water System

Product Installed:    AVK / ICV Series 76Concentric Butterfly Valve, from 65mm to 400mm - 600nos

AVK/ ICV Series 756 Double eccentric butterfly valve, 450mm - 65nos, 500mm - 04nos, 900mm - 42nos, 1100mm– 34nos


Case Study (Up@Robertson Quay)(Singapore)

Developer:  City Developments Limited

M&E Consultant:  Parsons Brinckerhoff

Project GFA: 108,000m2

Project Type:  Hotel

Application:  Chilled Water System

Product Installed:  ICV Series 955 PressureIndependent Control Valve, 25mm- 350nos

ICV Series 951 Pressure Independent Control Valve, from 25mm to 65mm - 65nos

ICV Series 908 Manual Balancing Valve, 200mm – 4nos

Note: First Project In Singapore comply to US LEED Standard and Singapore Green MarkPlatinum Standard

   

Case Study (Assisi Hospice)(Singapore)

Developer:  Assisi Hospice

M&E Consultant: Meinhardt Singapore

Project GFA: 33,000m2

Project Type:  Retail Mall, Office

Application:  Chilled Water System

ProductInstalled: CV Series 955 PressureIndependent Control Valve, 25mm- 250nos

ICV Series 951 Pressure Independent Control Valve, from 25mm to 150mm - 80nos, from65mm to 300mm – 10nos

   

Case Study (Paya Lebar Square)(Singapore)

Developer: Low Keng Huat (Singapore) Limited, Sun Venture Commercial Pte Ltd, Guthrie(PLC) Pte Ltd

M&E Consultant: Squire Mech Pte Ltd

Project GFA: 63,000m2

Project Type: Retail Mall,Office

Application:  Chilled Water System

Product Installed: ICV Series 952 Automatic Balancing Valve, 25mm to 50mm - 900nos

ICV Series 908 Manual Balancing Valve, 25mm to 450mm - 200nos

   

Case Study (Waterway Point)(Singapore)

Developer: Frasers Centerpoint Limited , Far East Organization, Sekisui House    

M&E Consultant: Meinhardt Singapore

Project GFA: 50,400m2

Project Type: Retail Mall

Application:  Chilled Water System

Product Installed: ICV Series 952 Automatic Balancing Valve, 25mm to 150mm - 600nos

ICV Series 908 Manual Balancing Valve, 250mm to 400mm - 16nos

   

Case Study (Yishun Community Hospital)(Singapore)

Developer: Ministry of Heath

M&E Consultant: Parsons Brinckerhoff

Project GFA: 50,000m2

Project Type: Hospital

Application:  Chilled Water System

Product Installed: ICV Series 952 Automatic Balancing Valve, 25mm to 50mm - 700nos

ICV Series 908 Manual Balancing Valve, 65mm to 400mm - 50nos

   

Case Study (Ngurah Rai Internation Airport)(Indonesia, Bali)

Developer: Government of Indonesia  

M&E Consultant: PT Arnan PratamaConsultants  

Project GFA:  80,000m2

Project Type:  Airport

Application:  Chilled Water System

Product Installed: ICVSeries 952 Automatic Balancing Valve, 25mm to 400mm - 200nos


Case Study (Murni Teguh Memorial Hospital)(Indonesia, Medan)

Developer: Murni Teguh Memorial Hospital  

M&EConsultant: PT Metakom Pratama Consultants              

Project GFA: 50,000m2

Project Type: Hospital

Application: Chilled Water System

Product Installed: ICVSeries 955 Pressure Independent Control Valve, 25mm - 300nos, 250mm to 400mm - 10nos


Case Study (Liberty Plaza Extension)(Sri Lanka, Colombo)

Developer: Colombo Land & Development Company PLC  

M&E Consultant:  Liberty Developers (Pvt) Ltd

Project GFA:  40,000m2

Project Type:  Shopping Mall

Application:  Chilled Water System

Product Installed:    ICV Full Range of GeneralValve

Motorized Butterfly Valves, Flexible Joint, Ball Valve

Y-strainer, Check Valve, Gate Valve and so on.

ICV Series 955 Pressure Independent Control Valve, 25mm - 120nos

ICV Series 951 Pressure Independent Control Valve, 25mm to 150mm - 10nos

ICVSeries 908 Manual Balancing Valve, 150mm – 6nos

   

Case Study (Jetwing Blue)(Sri Lanka, Negombo)

Developer: Jetwing Hotel Limited  

M&E Consultant:  Jetwing City Pvt Ltd  

Project GFA:  100,000m2

Project Type:  Hotel / Resort

Application:  Chilled Water System

Product Installed:    ICV Full Range of General Valve

Motorized Butterfly Valves, Flexible Joint, Ball Valve

Y-strainer, Check Valve, Gate Valve and so on.

ICV Series 955 Pressure Independent Control Valve, 25mm - 300nos

   

Case Study (Desa Desaru Hotel, Westin Desaru Resort & Desaru Conference Centre)(Malaysia, Desaru)

Developer: Destination Resorts and Hotel  

M&E Consultant: WSP /Parsons Brinckerhoff  

Project GFA:  200,000m2

Project Type:  Hotel / Conference Hall

Application:  Chilled Water System

ProductInstalled: ICVSeries 955 Pressure Independent Control Valve, 25mm - 1000 nos

ICV Series 951 Pressure Independent Control Valve, 25mm to 150mm - 50nos

   

Case Study (Sedona HotelExtension)(Myanmar, Yangon)

Developer: Keppel Land  

M&E Consultant: KTPConsultants Pte Ltd

Project GFA: 31,590m2

Project Type: Hotel

Application: Chilled Water System

Product Installed: ICV Series 908 PN25 Manual Balancing Valve, 100mm to 150mm - 10nos

ICV Series 76 PN25 Full Lug Butterfly Valve, 65mm to 400mm - 150nos

   

Case Study (Vattanac Capital Tower)(Cambodia, PhnomPenh)

Developer: Vattanac Properties Limited  

M&E Consultant:  JRoger Preston Limited  

Project GFA: 129,000m2

Project Type: Grade A Office, Retail Mall, Serviced Apartment

Application:  Chilled Water System

Product Installed: ICV Full Range of GeneralValve

Motorized Butterfly Valves, Flexible Joint, Ball Valve

Y-strainer, Check Valve, Gate Valve and so on.

ICVSeries 908 Manual Balancing Valve, 25mm to 400mm - 800nos

   

Case Study (Dhaka Stock ExchangeTower)(Bangladesh)

Developer: Dhaka Stock Exchange Ltd  

M&E Consultant: Development Design Consultants Ltd

Project GFA: 70,000m2

Project Type: Grade A Office

Application: Chilled Water System

ProductInstalled  ICV Series908 Manual Balancing Valve, 200mm to 400mm - 11nos